冷再生機施工進行碾壓時的五點操作

來源╃│•✘:http://www.soundaffectsdc.com/ 日期╃│•✘:2022-10-24 釋出人╃│•✘:guanli
在做好冷再生施工的過程中能夠節省很多的瀝清₪✘、沙石等原料的應用╃▩☁││,還能夠節約工程專案的時間步驟·◕☁。那麼冷再生機施工進行碾壓時的操作是怎樣的呢▩↟▩•?冷再生機租賃廠家為您講解·◕☁。
In the process of cold recycling construction, it can save a lot of raw materials such as asphalt, sand and gravel, and save the time and steps of the project. What is the operation of the cold recycling machine when rolling? The cold regeneration machine rental manufacturer will explain it to you.
(1)整形後╃▩☁││,當混合料的含水量為佳含水量(+1%~+2%)時╃▩☁││,應立刻用壓路機在構造層全寬內停止碾壓·◕☁。直線和不設超高的平曲線段╃▩☁││,由兩側路肩向路中心碾時╃▩☁││,應堆疊1/2輪寬╃▩☁││,後輪需超越兩段的接縫處╃▩☁││,後輪壓完路面全寬時╃▩☁││,即為一遍·◕☁。普通需碾壓4~6遍·◕☁。
(1) After shaping, when the moisture content of the mixture is good (+1%~+2%), the roller shall be used to stop rolling within the full width of the structural layer immediately. For straight lines and flat curved sections without superelevation, when rolling from the shoulders on both sides to the center of the road, 1/2 wheel width shall be stacked. The rear wheel shall exceed the joint of the two sections. When the rear wheel has finished rolling the full width of the road, it is one time. Generally, it needs to be rolled 4~6 times.
(2)嚴禁壓路機在已完成的或正在碾壓的路段上調頭或急剎車╃▩☁││,應保證改進土層外表不受毀壞·◕☁。
(2) It is strictly forbidden for the roller to turn around or brake suddenly on the completed or rolling road section, and the surface of the improved soil layer shall not be damaged.
(3)碾壓過程中╃▩☁││,水泥改進土的外表應一直堅持潮溼╃▩☁││,如水分蒸發過快╃▩☁││,應及時補撒少量的水╃▩☁││,但嚴禁灑大水碾壓·◕☁。
(3) During rolling, the surface of cement improved soil shall always be wet. If the water evaporates too fast, a small amount of water shall be sprinkled in time, but it is strictly prohibited to sprinkle large amounts of water for rolling.
冷再生機租賃
(4)經過拌和₪✘、整形的水泥改進土╃▩☁││,宜在水泥初凝前並應在實驗肯定的延遲時間內完成碾壓╃▩☁││,併到達請求的密實度╃▩☁││,同時沒有明顯的輪跡·◕☁。
(4) After mixing and shaping, the cement improved soil should be rolled before the initial setting of cement and within the delay time confirmed by the experiment to reach the required compactness without obvious wheel tracks.
(5)在碾壓完畢之前╃▩☁││,用平地機再終平一次╃▩☁││,使其縱向順適╃▩☁││,路拱和高契合設計請求·◕☁。終平應認真停止╃▩☁││,需將部分高出區域性刮除並掃出路外;關於部分低窪之處╃▩☁││,不再停止找補╃▩☁││,可留待下層施工時處置·◕☁。
(5) Before the rolling is completed, the grader shall be used for final leveling again to make it smooth in the longitudinal direction, and the crown and height shall meet the design requirements. The final leveling shall be stopped carefully, and the part higher than the local level shall be scraped and swept away; Some low-lying areas will not be repaired and can be left for disposal during the construction of the lower layer.
冷再生機施工進行碾壓時的五點操作就講解到這裡了╃▩☁││,提醒您對此在使用過程中做好維護保養事項╃▩☁││,以免出現問題影響裝置質量以及施工質量▩·!更多注意事項的瞭解就來我們網站http://www.soundaffectsdc.com諮詢吧▩·!
This is the end of the five points of operation during the construction of the cold recycling machine. We remind you to do a good job of maintenance during the use of this machine, so as to avoid problems affecting the equipment quality and construction quality! For more information, please come to our website http://www.soundaffectsdc.com Consult!

推薦閱讀/ Recommended reading

路面冷再生機是瀝青路面冷再生施工中的裝置╃▩☁││,使用效率高且效果好╃▩☁││,是不少施工地所考慮使用的裝置·◕☁。那你知道冷再生機是怎麼工作的嗎▩↟▩•?下面冷

高速公路上的冷再生是什麼意思 2022-11-25
路面冷再生機施工過程中常見問題解決 2022-11-21
路面冷再生機施工過程中常見問題及應對 2022-11-18
冷再生機突出的四大優勢 2022-11-16

推薦產品/ Recommended products

极品白嫩的小少妇,高h 重口 激h 慎宫交h,怡红院院,美女网站视频